Specialized Project Services

Expert support for complex, fast-track, or high-risk projects — from code strategy and integration, to on-site verification and authority approvals.

Request a Quote WhatsApp
Pre-Construction Advisory
Third-Party Integration
Multi-Stakeholder Support

Overview

We provide advanced support where standard approaches fall short—covering readiness assessments, budget-aligned planning, code clarification, and design reviews during design-build and EPC bids. Our team ensures that all stakeholders align early, reducing risks of delays or conflicts.

HVAC BMS Security Integrity Test
Specialized coordination & verification

What We Do

🧭

Pre-Construction & Design Advisory

Readiness reviews, scope shaping, budget alignment & compliance notes for tenders and bids.

🔗

Third-Party Integration

Interfaces with HVAC, BMS, Security, and life-safety systems with defined I/O lists & cause-and-effect.

🤝

Multi-Stakeholder Support

Owners, consultants, AHJ/Civil Defense, and execution teams aligned through workshops & reviews.

🧰

Subcontractor Coordination

Doors, smoke control, fire curtains, dampers, & safety interfaces validated against drawings & specs.

📝

Design Review & Tender Support

Value engineering, risk registers, RFIs & clarifications packaged for design-build / EPC submissions.

🛰

On-Site Verification

Point-to-point testing, panel logic checks, and interface demonstrations prior to authority witnessing.

🌀

Room Integrity Test (Door Fan Test)

Mandatory for clean-agent rooms to verify hold-time and enclosure tightness per NFPA 2001 & ISO 14520.

  • Site survey, door & leakage mapping, and temporary sealing plan.
  • Calibrated fan setup, baseline & pressurization/depressurization runs.
  • Software-calculated agent hold time and leakage equivalent area.
  • Defect list with photo evidence and sealing recommendations.
  • Re-test after rectifications; final pass report for authority/consultant.
  • Applies to FM-200®, Novec™/FK-5-1-12, Inert gases (IG-541/55/100).
NFPA 2001 ISO 14520 Hold-Time Leakage Area

Have a complex brief? Let’s de-risk it together.

Request a Quote WhatsApp